Structural treatment was carried out to stabilize the support system of both the canvas and the stretcher frame, addressing biological damage, material losses, and structural weaknesses using compatible and reversible materials.
Consolidation of the stretcher frame with 15% Paraloid B72 in acetone
Filling of wood losses in the stretcher frame using Araldite SV 427 with HV 427 hardener (1:1 ratio)